Cogeneration in Bischofshofen
- Location: Bischofshofen, Österreich
- Year: 2005
Description of Facility: biomass-cogeneration plant consisting of a hot water vessel 2.000kW and a thermo-oil vessel 5.000 kW incl. ORC-turbo generator
generation of heat and power at the same time (combined heat and power/CHP) as well as a gas vessel to cover minimum load
Objective:
- district heat supply of the city of Bischofshofen as well as power generation and energetic recovery into the mains of SAG (Salzburg AG).
Scope of Works: complete planning and engineering of EI&C equipment for the fully automatic control and regulation of the bio-vessels → i.a.
- load management of both bio-vessels and gas vessel
- power regulation
- burning regulation
- regulation of the net pumps
- hydraulics of the boiler house
- condensation facility
- E-filter
furthermore PMS provided the documentation for all EI&C distributors, PLC programming and visualisation as well as commissioning and optimisation of the plant-specific regulation parameters
planning, delivery, cabling, installation and commis-sioning of a low-voltage main distribution frame incl. the fully automatic switching and integration of a diesel-electric generating set and the USP unit.
EI&C installation, cabling, connections, support during commissioning
furthermore:
- complete infrastructure/building services as
- general lighting
- safety and escape route lighting
- IT – phone
- grounding
- lightning protection
- potential equalisation
- secondary cabling, captive transformer incl. integration and signal exchange of control system
- signal exchange and integration of ORC-process into control system
- signal exchange and integration of MSP-switch gears into control system
General: gas vessel in operation since November 2005
hot water vessel 2.000kW in operation since January 2006
thermo-oil vessel and ORC- power generator as well as E-filter and condensation in operation since May 2006